The start of works on the arrangement of flooring

In Bartolomeo Resort Town work is underway on the final arrangement of flooring which simultaneously performs several functions: leveling, noise- and waterproofing.
On the lower floors pipes for radiator installation have already been laid; a soundproofing layer of material with a teraf and a reinforced mesh have been laid; and final floor covering has been arranged with the help of a cement-sand screed.