Construction progress of Bartolomeo Resort Town residential complex: August, 2022:

1. Started work in the lobby of Tower II.
2. Amphitheater: facade work, waterproofing of terraces, wiring of heating systems, screeding in apartments are being carried out.
3. The arrangement of the exploited roof continues.
4. Arrangement of the courtyard on the roof of the stillobate of the first stage continues - waterproofing, screeding.
5. A ramp was being poured for the car to enter the amphitheater parking lot.
6. In Tower III, inter-apartment partitions of aerated concrete blocks are being built on the erected floors, the floor slab (ceiling) of the 17th floor is partially poured, and the formwork of the supporting columns of the 17th-18th floors is being installed.